Dams and hydraulic Engineering (Networks)
- Client: Town of Lancy, Construction and construction services (GE, Switzerland)
- Assignment: complete mandate SIA 103 (Swiss Standard)
- Total cost of work: 1,085 kCHF Including VAT
- Total cost of the assignment: 53.5 kCHF Including VAT
- Completion date: 2010
PROJECT DESCRIPTION AND CHARACTERISTICS
The project consists of the separation of the drainage network of Bac road.
Technical characteristics of the project:
- Installation of EU (waste water) / EC (clear water) networks in common excavation (EU Ø 300 mm, EC Ø 500 mm, L = 120 m)
- Installation of an EC network in a tube push under the Carrefour Bac road / Communes Réunies avenue (EC Ø 700 mm, L = 50 m)
- Laying of EC network in single excavation (EC Ø 700-800 mm, L = 130 m)
- Tubing of the existing EM pipes (EU Ø 300 mm, L = 135 m)
- Work in the Public Transport Genevois TPG
ASSIGNMENT
Realization of the complete services under the SIA 103 (Swiss Standard) including the proposed work, call for tender, execution project, works management, commissioning and completion.