04 50 95 38 14 info@geos-ic.com

Line 15 of the subway « Grand Paris Express » – Section Villejuif Louis Aragon – Pont de Sèvres – France

Line 15 of the subway « Grand Paris Express » – Section Villejuif Louis Aragon – Pont de Sèvres – France

Tunnels and underground constructions

  • Client: SOCIETE DU GRAND PARIS
  • Project Management:GROUPEMENT SETEC/INGEROP
  • Assignment: Concept studies in phases AVP and PRO
  • Total cost of works: €868k (firm order)
  • Completion date: 2013-2018

PROJECT DESCRIPTION AND CHARACTERISTICS

The study carried out by GEOS Ingénieurs Conseils constitutes a part of the project of construction of line 15 of the metro “Grand Paris Express”.

–           Technical characteristics :

  • The tunnel trajectory includes a tunnel Øi = 8.8 m of 4,000 m, dug with a cut-and-cover tunneling method, including three passages under the Seine,
  • The works are a part of the geological context of the Senonian chalk,
  • Construction of the entrance shaft of the cut-and-cover tunnel, Pont de Sèvres and Issy RER stations as well as the ancillary works.

 

ASSIGNMENT

As part of its participation, GEOS acts as a subcontractor of INGEROP.

GEOS participates in the project management of the civil engineering of the western section of lot 3 between Pont de Sèvres and Fort d’Issy / Vanves / Clamart.

GEOS conducted the Pre-Project and Project Studies.

These studies addressed, in particular, the following:

  • Geotechnical design of stations
  • Geotechnical design of the tunnel
  • Interaction with existing structures.

 