04 50 95 38 14 info@geos-ic.com

CIGEO – Bure (55) – France

CIGEO – Bure (55) – France

Tunnels and underground constructions

  • Client: ANDRA
  • Assignment: Draft studies, AMO of APS and APD phases,
  • Completion date: 2012-2017

PROJECT DESCRIPTION AND CHARACTERISTICS

The study carried out by GEOS Ingénieurs Conseils constitutes a part of the project of underground storage of radioactive waste.

The technical characteristics of the project are: realization of two 4km declines, 4,550m wells and 200km galleries and underground storage cells at 500m depth in the Callovo-Oxfordian argillites.

The minimum operating period is 100 years.

 

ASSIGNMENT

GEOS carries out the following missions:

  • Project management system: draft studies of the civil engineering of “underground works”;
  • Assistance to the Client for the APS and APD phases.

 

Skills

Posted on

2016-03-08