Dams and hydraulic Engineering (Pumping stations)

  • Client: RTS (Radio Television Switzerland)
  • Assignment: Project management + coordination of CVSE and electrical engineer representatives
  • Total cost of the work: 3,500k CHF
  • Total cost of the assignment: 240k CHF
  • Completion date: 2015 – 2016

PROJECT DESCRIPTION AND CHARACTERISTICS

The project consists of the realization of a water intake, a pumping station and a discharge in Arve, with capacity of 100 l / s, for free-cooling purposes.

The external works consist of the installation of the pumping network from Arve bed and introduction into the existing building, comprising:

  • DN400 HDPE trenches for pumping and rejecting,
  • V 3 mm stainless steel strainer in the Arve bed,
  • Prefabricated HDPE valve chamber on the RTS forecourt,
  • HDPE prefabricated dump chamber at the foot of the wharf wall,
  • Rejection of riprap of blocks arranged in the bed of the Arve,
  • Carrying out works in the bed of the Arve in a self-supporting sheet pile enclosure PU-18

The internal works consist of the realization of the primary network from the introduction of the building to the exchangers, comprising:

  • Stainless steel Ø323 mm return pipes,
  • Vacuum pump station for the priming of the siphon comprising 2 Evisa E-50 vacuum pumps of 2 × 50 m³ / h,
  • Pumping station comprising 4 KSB-Sewatec pumps with a nominal capacity of 100 l / s,
  • Two filtration lines including Boll & Kirch sieve filters and Lakos vortex sand separator,
  • Three heat exchangers with a total capacity of 3 MW,
  • Reinforcement of the existing civil engineering structures,

ASSIGNMENT

GEOS carried out a project management task comprising (according to SIA 103 (Swiss Standard)):

  • Project of works;
  • Procedure for requesting authorization;
  • Invitations to tender, comparisons of offers, proposals for tenders;
  • Execution Project;
  • Follow-up;
  • Commissioning and completion.

As well as coordination of CVSE engineer and electrician attorneys and management of the project group.

 

Skills

Posted on

2016-09-16