04 50 95 38 14 info@geos-ic.com

Wastewater disposal system between St Genis Pouilly and Choully (01) – Switzerland/France

,
Wastewater disposal system between St Genis Pouilly and Choully (01) – Switzerland/France

Geotechnics
Tunnels and underground constructions

  • Client: Local Group Coopération Transfrontalière (G.L.C.T.)
  • Assignment: Complete project management (AVP, PRO, ACT, VISA, DET, AOR)
  • Total cost of work: € 463k
  • Completion date: 2006-2010

PROJECT DESCRIPTION AND CHARACTERISTICS

The project involves building a sewage disposal tunnel between St Genis Pouilly in France and Choully in Switzerland.

The project consists of:

  • a 3,000m long gallery, Ø 2,500 m;
  • 6 collectors Ø 1,000 to 1,500 with a cumulative length of 778m;
  • 4 access wells.

ASSIGNMENT

GEOS Ingénieurs Conseils carried out the project management on behalf of the Local Group Coopération Transfrontalière (G.L.C.T.)

The studies included the following:

  • geotechnical supervision of the works, tunnel cutting face description;
  • all the missions of the MOP law (AVP, PRO, ACT, DCE, VISA, DET);
  • AMO, Schedule management and bi-national aspects (customs, taxation, environment, social law, …).

 

Skills

Posted on

2016-03-10